Declaration for re-bar fabrication works in mezzanine floor of “Chondrimay Nipobon” project at Jolshiri, Sector-16. May 3, 2026

Project: Chondrimay Nipobon
Location: Jolshiri Abashon, Sector-16, Road-404A, Plot-009
Element: Mezzanine Floor

Date: 03/05/2026

Subject: Declaration of compliance for Re-bar (Reinforcement Bar) fabrication works on the Mezzanine floor.

By the grace of Almighty Allah, we hereby declare the following with respect to the Re-bar fabrication works currently in progress at the Mezzanine floor of the “Chondrimay Nipobon” project:

  1. Compliance with Drawings: All re-bars are being fabricated strictly in accordance with the approved structural drawings (Drawing No: [Insert Number if available]) and bending schedules for the Mezzanine floor.
  2. Material Standard: The reinforcement bars used are of specified grades and diameters as required for the Mezzanine slab/beams. All materials are from approved sources/batches.
  3. Fabrication Quality: Cutting, bending, and shaping of the bars are being carried out by skilled workers. The dimensions, bend angles, and hook lengths meet the standard engineering practice and project specifications.
  4. Inspection Status: The fabricated bars are kept in designated areas pending inspection. Any rejected or damaged bars have been removed from stock.
  5. Cover and Spacing: Appropriate spacers, chairs, and cover blocks will be used during placement to maintain the required concrete cover as per design.
  6. Safety & Workmanship: All work is being performed with due diligence to safety standards and quality workmanship, seeking perfection in the structural integrity of the Mezzanine floor.

We affirm that the information above is true and accurate to the best of our knowledge.

By the grace of Almighty Allah, we seek to complete this task with precision and integrity.